Back to home

    DesignDock-NB · New Building

    Know where
    every hull stands.

    DesignDock-NB gives shipowners, newbuilding consultancies and shipyards a shared, detailed view of construction progress, from contract signing and steel cutting to sea trials and delivery.

    DesignDock-NB ship specifications dashboard showing vessel details, hull number, project progress, and construction milestones

    Stage by stage

    Every stage of construction. In one place.

    Follow each hull from contract to delivery. See planned and actual dates for each milestone, progress for each production phase, and the open inspection items behind those numbers.

    1. Completed

      Contract signing

      Specs, plan and baseline schedule

    2. Completed

      Steel cutting

      Plate and profile cutting starts

    3. Completed

      Keel laying

      First block placed on the berth

    4. In progress

      Launching

      Hull floated out, outfitting continues

    5. Upcoming

      Sea trials

      Speed, endurance and systems tests

    6. Upcoming

      Delivery

      Handover with delivery documents

    Hull production progress

    Example hull
    Steel cutting100%
    Block fabrication92%
    Block erection78%
    Outfitting46%
    Coating31%

    The detail behind every percentage

    Daily inspections, non-conformities and HSE observations are recorded for each area of the vessel, so a milestone shows as complete only when the work behind it is actually done.

    HullOutfittingPipingMachineryElectricalAccommodationCoatingHSE

    Progress you can trust,
    detail you can check.

    Milestone tracking

    Planned, actual and forecast dates for contract, steel cutting, keel laying, launching, sea trials and delivery.

    Production progress

    Progress for each hull across steel cutting, block fabrication, erection, outfitting and coating.

    Daily inspections

    Inspection status for each block, tank and machinery space, so nothing is missed before a milestone.

    Non-conformity tracking

    Open and closed items by category (hull, outfitting, piping, machinery, electrical), with ageing.

    Document repository

    Progress reports, photographs, contractual documents and delivery documents, organised for each hull.

    Shared, role-based access

    Owners, consultants and shipyards work from the same data, and each party sees what it needs to see.

    Real-Time Visibility

    Track every phase.
    See every detail.

    Monitor project timelines with visual tracking across all construction phases. Compare planned vs actual progress with forecast projections.

    Project Progress Tracking dashboard showing timeline comparison across plan revisions with actual progress and forecast for ship construction phases

    Document Control

    Every document.
    Organized. Accessible.

    Centralized repository for all project documentation. From progress reports to delivery documents, everything in one place with version control and secure access.

    Document Repository interface with organized folders for progress reports, delivery documents, and inspection records
    Non-Conformity tracking dashboard displaying issues by category with resolution status and detailed summary reports

    Quality Assurance

    Zero compromise.
    Total control.

    Track non-conformities across all categories. Monitor resolution status, identify trends, and ensure compliance at every stage of construction.

    HSE Excellence

    Safety first.
    Always.

    Health Safety Environment dashboard displaying HSE status with open vs closed issues by category for ship construction

    Daily Operations

    Inspect daily.
    Build confidently.

    Track inspection status across hull blocks, tanks, and machinery. Visual matrix shows completion at a glance, ensuring nothing is missed.

    Daily Inspection Status matrix showing punch-blocks inspection tracking with color-coded completion status grid

    One source of truth for everyone on the project

    Each party sees the same progress, so there are fewer arguments about status and more time spent building.

    Shipowners

    Follow every hull in the newbuilding programme without waiting for the monthly report. See milestone dates, progress for each phase and open quality issues as they happen.

    Newbuilding consultancies

    Record site inspections, non-conformities and HSE observations once, and share them with the owner straight away. Your supervision reports come from the same data.

    Shipyards

    Report progress against the agreed plan, close out inspection items and keep delivery documents organised for each hull, all in one place the owner already trusts.

    See your newbuilding programme clearly.

    Find out how DesignDock-NB can track your next hull, from steel cutting to delivery.