Comparison · Plan approval

    DesignDock-PA vs. email and shared folders

    Most shipbuilding plan approval still runs on email threads and shared folders. It works for a handful of drawings. On a newbuilding with hundreds of drawings and several parties, it falls apart. Here's a side-by-side comparison.

    Where comments live
    Not handledEmail + shared folders: Spread across many email threads, replies and forwards. Some are in attachments, some in the email body.
    Handled wellDesignDock-PA: One thread per drawing. Every comment and reply stays with the drawing it belongs to.
    Latest revision
    Not handledEmail + shared folders: File names like “RevB_final_v2.pdf”. Whoever saw the latest email knows which one is current.
    Handled wellDesignDock-PA: Each resubmission is a numbered revision. Everyone sees the same current version and the full history.
    Comment status
    Partly handledEmail + shared folders: Someone keeps a spreadsheet, rebuilt by hand before each meeting.
    Handled wellDesignDock-PA: Each comment is open or resolved, linked to the revision it was raised on.
    Who sees what
    Not handledEmail + shared folders: Depends on who was in To or CC. People added later miss the history.
    Handled wellDesignDock-PA: Everyone invited to the project sees the full thread, including people who join later.
    Final approval
    Partly handledEmail + shared folders: An email saying “approved”, somewhere, for some revision.
    Handled wellDesignDock-PA: The approved revision is recorded on the drawing, with who approved it and when.
    Audit trail
    Not handledEmail + shared folders: Exists only if every inbox is kept and searchable, and nobody has left.
    Handled wellDesignDock-PA: Kept with the drawing for the life of the project, independent of individual inboxes.
    Project overview
    Not handledEmail + shared folders: No overview without manual tracking.
    Handled wellDesignDock-PA: Status of every drawing in the plan approval list (submitted, commented, approved) at a glance.

    Why email breaks down on a newbuilding

    A typical newbuilding has hundreds of drawings across hull, machinery, electrical and outfitting. Each drawing can go through several revisions, and each revision collects comments from the owner's superintendents, consultants and sometimes class.

    With email, every one of those comments becomes another message. Threads split when someone replies to an older email. Attachments are renamed. People go on leave, change roles or leave the project. After a few months, answering a simple question like “has comment 12 on the midship section been closed?” means searching several inboxes.

    Shared folders solve storage, not discussion

    Shared folders (network drives, SharePoint, Dropbox and similar) make it easier to find the latest file. But they don't hold the conversation. Comments still go by email or in marked-up PDFs, and nothing links a comment to the revision it was raised on, or records that it was resolved.

    What changes with DesignDock-PA

    DesignDock-PA treats each drawing as a record with its own revision history and comment thread. The shipyard submits, the owner's experts comment, the yard replies and resubmits, and the drawing is approved when every comment is resolved, all in one place.

    Both sides see the same status at the same time, so meetings are spent on technical decisions rather than reconciling who said what.

    When the old way is good enough

    If you're approving a few drawings for a small repair or conversion job, with two or three people involved, email is usually fine. The problems grow with the number of drawings, revisions and parties, which is exactly what a newbuilding has.

    Frequently asked questions

    Can we still receive email notifications?

    The point of DesignDock-PA is that the discussion lives on the drawing, not in email. Ask us in the demo how notifications work for your team.

    What happens to drawings we've already approved by email?

    Many teams start DesignDock-PA with the drawings still in review, and keep earlier approvals as reference documents. We'll help you plan the switch-over.

    Does the shipyard have to agree to use it?

    Yes. Plan approval is a two-sided process, so both the owner's and the shipyard's experts work in the same project.

    See the difference on your own project.

    We'll show you DesignDock on a project like yours.